Get in touch
Fill out the form or contact us, and we will get back to you.
or contact us directly
Radek Juchelka
Head of Sales, Machinery Division
OSTROJ a.s.
Tesinska 1586/66
746 01 Opava, CZ
For the Gabčíkovo Waterworks, we manufactured a 34-meter-long, 225-ton backup gate, a record-breaking project as part of the major modernization of the navigation locks. Due to its massive dimensions, the gate was produced in eight separate sections and welded together on-site. This project builds on our previous successful delivery of control gates for the right navigation lock, further strengthening our expertise in large-scale hydro-engineering solutions.
Fill out the form or contact us, and we will get back to you.
OSTROJ a.s.
Tesinska 1586/66
746 01 Opava, CZ